Saturday, October 10, 2015

Prepping for the Shoot


I'm working on a video series on synthesis, and am setting up a corner of the house to be a specific patching location. This way, I don't have to worry about setting up lighting and camera position every time I want to pump out a video.

Work continued today, with the Foundation 2 system wired and tested through a Yamaha MS-202 powered speaker. A couple of Ikea lamps will provide LED-based lighting. Next up is the installation of the MIDI keyboard and placement of the video camera mount.

Whee!

[ddg]

No comments:

Post a Comment